    KESCO pre-use inspection fee calculator

    Budget for the Korean private receiving-installation inspection that applies to your confirmed classification. The official 2026 table separates base fees, capacity fees and extra line items; the calculator also handles the distribution multiplier and customer-requested night/holiday surcharge. Ordinary pre-use checking is a different service and has no inspection fee.

    MAKE IT SIMPLE

    KESCO · 2026 private receiving-installation construction inspection table. Inspection and pre-use checking are different services; choose your confirmed classification.

    Additional receiving-installation line items

    Capacity charge caps at 200,000 kW. For high voltage at 1,000+ kW, capacity rates accumulate: first 1,000 × 268, next 99,000 × 152, remaining × 32. Extra pole/tower/circuit charges do not receive the 30% timing surcharge. VAT 10% is separate; VAT/surcharge round to whole won for this estimate.

    Receiving-installation construction only. Reinspection, partial/simultaneous inspections, equipment-only changes, generation/PV/ESS installations and special discounts need a separate calculation. Low-voltage status and inspection eligibility are not determined by this calculator.

    Calculation basis

    KESCO · 2026 annual receiving-installation construction inspection fee table.

    Basis reviewed: 2026 Q4 · 21 October. Fee revisions are not applied automatically.

    Result

    Worked examples

    Low-voltage inspection; 100 kW; no extras, distribution or timing surcharge

    KRW 133,100 + VAT 13,310 = 146,410

    Base 94,000 plus 100 × 391 = 133,100 before VAT.